Cochrane: Heartland, Riviera, Sunset Ridge, Heritage Hills, Fireside — Okotoks: Air Ranch, Cimarron, Crystal Shores, Drake Landing, D'Arcy Ranch
SW Calgary service info
Quadrant
SW Calgary
Key neighbourhoods
Cochrane: Heartland, Riviera, Sunset Ridge, Heritage Hills, Fireside — Okotoks: Air Ranch, Cimarron, Crystal Shores, Drake Landing, D'Arcy Ranch
Typical home type
Newer small-town builds with large lots, oversized garages, and homeowners who take pride in their properties
Drive time from shop
35–45 min
What we see on the ground in this quadrant — and how it shapes how we work.
Assess first, quote second, work third. Same process on every job.
01
We visit the space, assess the concrete, test for moisture, and check for any existing coatings or damage. You get a written quote covering system, scope, and timeline before any commitment.
02
Planetary grinder opens the slab to CSP 3. HEPA dust extraction runs the whole time. Existing coatings, paint, or contamination removed completely before any primer goes down.
03
If the slab reads above 4.5%, MVB FC/RC goes down before primer. On older SW Calgary slabs especially, this step is not optional — moisture is the most common cause of failure and it’s flagged at the assessment stage so there are no surprises.
04
Fusion Primer applied, followed by the base coat and Flake broadcast or metallic pour depending on the system selected. Wet film thickness checked throughout.
05
Polyaspartic topcoat applied. Return-to-service time confirmed based on the cure formulation. We walk the floor with you at completion and leave care instructions before we go.
Both. Cochrane and Okotoks are separate service runs but both are in our regular schedule. Heartland, Riviera, Sunset Ridge, Heritage Hills, and Fireside in Cochrane; Air Ranch, Cimarron, Crystal Shores, Drake Landing, and D'Arcy Ranch in Okotoks. Get a quote and we will confirm availability.
We do not add hidden travel fees. The quote covers the full job. Distance is factored into scheduling, not into a separate line item that surprises you after the fact.
Yes, and we do a lot of them out here. Cochrane and Okotoks homeowners have larger garages and above-average interest in metallic systems. A full metallic pour in a triple garage is one of the more impressive results we produce. We will walk you through the system and realistic outcome expectations at the site assessment.
Timeline depends on the system and the square footage. A standard Flake system in a double or triple garage is typically a one-day job. Metallic systems require specific pour conditions and may involve a two-stage schedule depending on garage size. We confirm the full timeline at the quoting stage.
We assess the slab, test for moisture, and give you a real number. No guesswork. No phone call required.